Koldam Hydroelectric Project
The 800 MW Koldam Hydropower Project consists of an embankment dam.
Encardio-rite was selected to provide the geotechnical instruments for monitoring of this prestigious project. The instrumentation work was carried out successfully, which consisted of monitoring the dam and commissioning an automatic data acquisition system. NTPC was quite appreciative of the instruments as the monitored data helped them in taking many critical decisions during the filling of the dam.
Instrumentation installed included a piezometer , strain gage , prism targets, multipoint borehole extensometers (electronic; 2, 3, and 5 points), plumb lines , joint meter, temperature meter, portable readout units , an automatic data acquisition system, and seismographs.
Project Details Koldam Hydroelectric Project Location Sutlej River, Mandi district, Himachal Pradesh, India. Client NTPC Limited (National Thermal Power Corporation) Contractors Italian-Thai Development Public Company Limited (ITD)
| Project Details | Koldam Hydroelectric Project |
|---|---|
| Location | Himachal Pradesh, India |